Water Line Demonstrators – Installation and Operation Start Deliverable 2.3.

Water Line Demonstrators – Installation and Operation Start Deliverable 2.3.

Water Line Demonstrators – Installation and  Operation Start Deliverable 2.3.

This deliverable provides an overview of the progress and outcomes achieved under Tasks 2.1
and 2.2 of the project’s Water axis. It focuses on the development of a comprehensive Water
Inventory and the implementation of the four Circular Water System Solutions (CWSS)
demonstrators. The report captures the advancements made in mapping and analysing existing
water management systems in urban and peri-urban contexts, as well as the initial setup and
operationalization of the demonstrators, which aim to validate and showcase innovative
approaches to circular water management.
The document integrates both analytical and practical dimensions of the work performed to date.
It outlines the methodologies used for data collection and system mapping, the technical and
operational features of the demonstrators, and, when available, the preliminary outcomes of their
deployment. Together, these activities constitute the foundation for future modelling, monitoring,
and replication efforts within the project.

 Click here to download:

Deliverable 2_3 – Water Line Demonstrators_Installation and Operation Start_v1 (1)